Mixing System/ Mixing Group Floor Heating System / Temperture Control by Thermostatic Radiator Valve

Product Details
Customization: Available
Type: Floor Heating
Certification: CE
Gold Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Export Year
2019-04-12
OEM/ODM Availability
Yes
Find Similar Products

Basic Info.

Model NO.
XF15400A
Structure
Save Enegry
Brand
N/M or OEM
Transport Package
Export Standard
Specification
1" X210MM
Trademark
AIBOHOME
Origin
China
HS Code
8481804090
Production Capacity
8000000

Product Description

MIXING GROUP use high quality brass by hot forgen. 
Use AIBOHOME mixing group can help you to save energy max 20%  

please cooperate with our manifolds for your system, you can download from our catalogue 

International cutting-edge process high-density hot stamping,
integral forging one-time molding, integral connection, 100%
ultrasonic testing and pressure test to ensure no leakage, adopt ball
valve structure switch, convenient to check the water separator, large
water flow and stable temperature adjustment, especially suitable for
wall hanging Furnace floor heating.

Technical parameters

Material: brass hpb57-3
Nominal pressure: ≤ 10bar
Applicable medium: cold and hot water
Working temperature: t≤100ºC
Temperature control range: 30~70ºC
Temperature control accuracy: ±1ºC
Pump connection thread: G 11/2"
Connection thread: ISO 228 standard

Working principle: Работать на принцепе:

The temperature control valve head sets the mixed water temperature
and operates according to the pointer's corresponding temperature mark;
the temperature sensing package measures the mixed water
temperature, and controls the mixed water ratio and the mixing
temperature through the power part in the temperature control valve
head; the front end receives the water separator, Dividable control of high
temperature heat sinks and towel racks for return water; undistributed
water collectors. Controlled floor heating warm water is not higher than
60°C. The by-pass is used to ensure the minimum flow at the primary
side and stabilize the primary pressure differential to avoid high
temperature faults and water flow faults of the unit, affecting the heating
effect, saving 20% energy, small installation volume, and optimal
concentration Control heating system.

Термо  головка клапана регулировки температуры задает температуру
смешанной воды,
Следуйте указаниям соответствующей маркировки указателя;
Чувствительная температурная упаковка для измерения температуры
смешанной воды,
И через силовой клапан в головке клапана регулирования температуры для
регулирования соотношения смешивания и температуры смешивания;
Передний водоотделитель,Дизельное управление высокотемпературными
радиаторами и полотенцесушителями дя обратной воды;Неограниченные
коллекторы.Регулируемый подогрев пола не выше 60 ° C,Байпас
используется для обеспечения минимального расхода первичной стороны и
стабилизации перепада давления первичной стороны,Чтобы избежать
высокотемпературных сбоев и неисправностей потока воды в блоке,Влияют
на эффект нагрева, энергосберегающие 20%, небольшой монтажный объем и
лучшая централизованная система управления отоплением.

Quality Control
Mixing System/ Mixing Group Floor Heating System / Temperture Control by Thermostatic Radiator Valve
 

Hot forge

 

Our brass valve is produced by forging, through forging the valve product strength is greater, no porosity, can effectively prevent the leakage of the valve body.

CNC Machining

Our products are processed by precision CNC machine tools, with high machining accuracy up to 0.1 micron. We have machining centers to meet customers' requirements for products with high coaxiality
Mixing System/ Mixing Group Floor Heating System / Temperture Control by Thermostatic Radiator Valve
Mixing System/ Mixing Group Floor Heating System / Temperture Control by Thermostatic Radiator Valve
Mixing System/ Mixing Group Floor Heating System / Temperture Control by Thermostatic Radiator Valve
 

Machining Inspection

 

 

In our machining process, each size needs to be strictly tested. Workers will conduct a self-inspection of their products every 2 hours, and QC will conduct a workshop inspection every 2 hours to ensure that the size of products fully meets the requirements of the drawings


Mixing System/ Mixing Group Floor Heating System / Temperture Control by Thermostatic Radiator Valve

Assembly Room

Our assembly shop USES the assembly line, the result of teamwork can guarantee the output of a large quantity of products.100% of the products on the production line need to pass the leak test. We use the pressure of 6-8bar to test each product. Only after passing the test can the products be packed into cartons.


FAQ

1. Can I have a sample order for valve?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable

2. Do you have any MOQ limit for valve order?

A: YES, But low MOQ, for quantity you should to contact with us and to negotiate.

3. How to proceed an order for valve?

A: Firstly let us know your requirements or application.you can give me our item number and size and your order quantity. If there is not the same products, you can give me your drawing. 

Secondly We quote according to your requirements or our suggestions.

Thirdly customer confirms the price and places deposit for formal order. confirm the sample(if need) 

Fourthly We arrange the production and delivery. 

4. Do you offer guarantee for the products?

A: Yes, we offer 3 years warranty to our products.

 

5. What is your delivery time. 

 

A: production time needs 35-45 days,if the first time confirm samples, should be negotate.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier