Customization: | Available |
---|---|
Temperature: | Low Temperature |
Standard: | En13828 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brass Balance Valve
|
|
Size
|
1/2" 3/4" 1" 11/4" 11/2" 2"
|
Material
|
Brass
|
Surface
|
Brass/Nickel Plating
|
Connection
|
Male & Female
|
Thread
|
BSP
|
Working Temperature
|
0 ºC to 120 ºC
|
Medium
|
Oil,Gas,Water
|
Test Pressure
|
100% tested with 0.6MPa - 0.8MPa by air
|
OEM Accept
|
Yes
|
Place of origin
|
Zhejiang,China(Mainland)
|
KVS
DN15 | DN20 | DN25 | DN32 | DN40 | DN50 | |
KVS m³/h | 5.10 | 5.98 | 9.17 | 9.50 | 13 | 14.3 |
Dimension
Size | D mm | L mm | L1 mm | Weight-g(±3%) |
1/2 | 70 | 65 | 93.5 | 400 |
3/4 | 70 | 68 | 93.5 | 405 |
1 | 70 | 75 | 95 | 520 |
1 1/4 | 70 | 90 | 97.5 | 722 |
1 1/2 | 70 | 100 | 103 | 879 |
2 | 70 | 110 | 103 | 1056 |
WRANING
1. The opening of the balance valve should not be arbitrarily changed. After debugging of the balance valve installed in the pipe network system, in order to maintain the balance state of the system, the opening of the balance valve should not be arbitrarily changed during the normal operation of the system, especially the opening locking device.
2. Pay attention to the balance between the new system and the old system
When a new system installed with a balance valve is connected to the original system, attention should be paid to the balance of water flow distribution between the new system and the original system so as to prevent the new system (or modified system) installed with a balance valve from reaching the proper water flow. A balance valve should be installed at the entrance of the original system.
In our machining process, each size needs to be strictly tested. Workers will conduct a self-inspection of their products every 2 hours, and QC will conduct a workshop inspection every 2 hours to ensure that the size of products fully meets the requirements of the drawings
Our assembly shop USES the assembly line, the result of teamwork can guarantee the output of a large quantity of products.100% of the products on the production line need to pass the leak test. We use the pressure of 6-8bar to test each product. Only after passing the test can the products be packed into cartons.
1. Can I have a sample order for valve?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable
2. Do you have any MOQ limit for valve order?
A: YES, But low MOQ, for quantity you should to contact with us and to negotiate.
3. How to proceed an order for valve?
A: Firstly let us know your requirements or application.you can give me our item number and size and your order quantity. If there is not the same products, you can give me your drawing.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the price and places deposit for formal order. confirm the sample(if need)
Fourthly We arrange the production and delivery.
4. Do you offer guarantee for the products?
A: Yes, we offer 3 years warranty to our products.
5. What is your delivery time.
A: production time needs 35-45 days,if the first time confirm samples, should be negotate.